Submission date: |
|
Entrepreneur's Country of Origin: |
Perú
|
Round: |
1ª Ronda de Inversión en Perú
|
Country of Project Execution: |
Perú
|
Investment: |
1.200.000
|
Currency: |
USD
|
Energetik Heart: This project involves the construction and assembly of a portable river to install a modular, closed-loop micro-hydroelectric power plant. Designed for the backyards of industries and mines, this system allows businesses to meet 100% of their energy needs with renewable power. It can reduce costs by 70% or more, minimize their carbon footprint, and provide independence from public power grids.